DuPage Water Conditioning Assembled Softeners, Filters and Valves
To return to the previous page, click here.
(Or use the "Back" button on your browser)

SYSTEM INFORMATION

(Click on System # for more information)
Control
Valve
Series
SYSTEM 2
Single Tank
SYSTEM 3
Duplex
SYSTEM 4
Single Tank
SYSTEM 5
Twin Tank
Interlock
SYSTEM 6
Twin Tank
SYSTEM 7
Twin Tank
Alternating
SYSTEM 8
Twin Tank
Alternating
2850 YES YES YES N/A N/A N/A N/A
2900 YES YES YES YES YES YES N/A
3900 YES YES YES YES YES YES N/A
9500 N/A N/A N/A N/A N/A N/A YES



SYSTEM OPERATING DESCRIPTION
2 Day Clock Regeneration: 1-Tank, Set the days that regeneration is to occur by sliding tabs on the skipper wheel outward, set time of day. The unit is factory set to regenerate at 2:00 a.m. on specified day tab. Top of Page
3 Day Clock Regeneration: 2-Tanks, 2-Control Valves, 2-Brine Tanks. Set the days that regeneration is to occur by sliding tabs on the skipper wheel outward, set time of day. The unit is factory set to regenerate at 2:00 a.m. on specified day tab. Top of Page
4a Meter Demand Delayed Regeneration: 1-Tank, 1-Meter system. When the meter zeroes out, the unit remains in service until 2:00 a.m. At that time it will regenerate automatically. Top of Page
4b Meter Demand Immediate Regeneration: 1-Tank, 1-Meter. When the meter zeroes out, the unit goes immediately into regeneration. Top of Page
5 Meter Demand Regeneration: 2-Tanks, 2-Controls, 2-Meters, Interlock System. Both units in service at the same time. When one of the meters zeroes out, that unit starts into a regeneration. The other unit remains in service, even if it zeroes out. Top of Page
6 Meter Demand "Series Regeneration:" 2-Tanks, 2-Controls, 1-Meter, 2-Brine Tanks. Both units in service at the same time. When the meter zeroes out, the "Lead" unit regenerates. Once the lead unit has returned to the service position, the "Lag" unit will regenerate. Top of Page
7 Meter Demand "Alternating:" 2-Tanks, 2-Controls, 1-Meter, 2-Brine Tanks. One unit in service, the other is on standby. When the meter zeroes out, the unit in service goes into a regeneration cycle. The standby unit goes into service. Top of Page
8 Meter Demand "Alternating:" 2-Tanks, 1-Control Valve with 2nd tank adapter, 1-Meter, 1-Brine Tank. One unit in service, the other is on standby. When the meter zeroes out, the unit in service goes into a regeneration cycle. The standby unit goes into service. Top of Page

To return to the previous page, click here.
(Or use the "Back" button on your browser)


To request more information or a complete DuPage product catalog,
please go to our Feedback Page, or send email to:
wholesale@dupagewater.com.


Other Wholesale Pages:
Assembled Softeners, Filters and Valves
Drinking Water Systems and Faucets
Chemical Feed - Chlorination - Aeration
Housings, Cartridges, Spin-Down and Sand-Master
Fiberglass Pressure Tanks
Resin and Media
Component Parts
Hot Water
System Sizing Calculator

Click here to return to the main Wholesale page

Home | What's New | About Us | Retail Products | FAQ
Restaurant Products | Wholesale Products | Feedback


DuPage Water Conditioning
27 W 250 North Avenue
West Chicago, IL 60185
(630) 293-7500
info@dupagewater.com

Comments or questions about our web site?
Send email to: webmaster@dupagewater.com

Copyright © 2009 DuPage Water Conditioning
http://www.dupagewater.com